Integrated Distribution System Planning – Department of Energy

distribution system planning

NLR's distribution system research aims to ensure reliable, affordable, and resilient power delivery throughout the energy transition. Distribution systems and planning training has been made possible through the U.S. Visit the OPUC UM 2197 to follow the docket, view the procedural schedule and provide comments. Climate realities are a key driver of the transformation underway in the energy industry. Initial comments responding to filed DSPs will be accepted 90 days after the utility DSP filing and reply comments will be accepted 30 days after the initial comment period. Under Commission directive, a Staff Collaborative Session took place on December 17, 2024.

The September 26, 2024 Commission Order in Case No. https://helm-engine.org/tag/internet-connectivity U discussed storm reliability data, distributed energy resource metrics, and summarized Staff’s Benefit Cost Analysis report and next steps. The September 11, 2019 Commission Order in Case No. The October 11, 2017 Commission Orders in Case Nos.

  • NLR is exploring how to leverage demand-side flexibility in system planning, with analysis of how aggregators can provide system services and potential impacts to system resilience.
  • As part of this work, NLR is building out the Capacity Expansion Decision Support for Distribution Networks (CADET) model to deliver forward-looking, multi-objective investment strategies for utilities and policy makers.
  • The Michigan Public Service Commission (Commission) has ordered several utilities to file electric distribution system plans (DSPs) at various times beginning in 2018.
  • In partnership with Sacramento Municipal Utility District, NLR developed an R&D 100 award-winning solution to automate and streamline DER interconnection called PREconfiguring and Controlling Inverter SEt-points, or PRECISE.
  • Advanced metering infrastructure has enabled visibility at the grid-edge, and NLR is advancing advanced metering infrastructure analytics for distribution planning.

The September 26, 2024 Commission Order in Case No. U discussed storm reliability data, distributed energy resource metrics, and summarized Staff’s Benefit Cost Analysis report and next steps. The September 11, 2019 Commission Order in Case No. The October 11, 2017 Commission Orders in Case Nos.

Core Sector: Electric Distribution

Large-scale long-term distribution system analysis is becoming critical as power grids need to modernize and accommodate DERs and electrification growth. DER and EV hosting capacity – Distribution Integration Solution Cost Options (DISCO) NLR's distribution planning suite includes datasets and software tools that cover data analytics, scenario development, simulation engines, and applications. Today, NLR's distribution system analysis is multi-objective and covers multiple spatial and temporal scales.

As distribution networks expand, it is critical to ensure they are resilient to increasing threats from extreme weather. Electric power distribution covers the last mile of the grid, taking electricity from high-voltage transmission to the customer. The IDSP activity is a component of the Distribution Grid Transformation effort.

distribution system planning

Electric distribution investments have become a major driver for recent rate case requests as investor-owned utilities (utilities) invest to improve electric distribution system performance and evolve with growing customer demands to meet future grid expectations. Grid and buildings researchers at NLR developed the Object-Oriented Controllable High-Resolution Residential Energy (OCHRE) Model to enable analysis of buildings to provide flexibility and grid-services. A large focus of NLR's distribution system analysis is examining use cases of Advanced Distribution Management System and Distributed Energy Resource Management Systems. The Lawrence Berkeley National Laboratory supports the Department’s efforts in Integrated Distribution System Planning where additional materials are available. The goals are also to provide technical assistance to state energy officials and utility regulators and to improve upon the IDSP practices.

distribution system planning

NLR's distribution system analysis has also been used for grid integration technical assistance in Cambodia, Lithuania, Nigeria, Tunisia, United Arab Emirates, and Vietnam. With evolving communications and control, there are increasing opportunities to procure flexibility from the demand-side (customers). Using the Hierarchical Engine for Large-Scale Co-Simulation (HELICS) model, NLR co-simulates quasi-static power-flow, real-time digital simulations, and electromagnetic transient models for multiple DER use-cases. Department of Energy's Grid Deployment Office on best practices and utility case studies for resilience planning for wildfires, winter, and nonwinter storms. NLR is also developing capabilities in distribution system protection analysis and examining the impacts of DER on protection equipment. Department of Energy's Office of Electricity to understand the long-term drivers and demand from distribution transformers, helping the industry forecast annual demand to alleviate supply chain constraints.

In South Africa, NLR worked with multiple government and industry stakeholders to examine the potential of demand response at the grid-edge. Another major focus on NLR's interconnection research is expanding capabilities to conduct distribution system hosting capacity analysis. NLR has also explored machine-learning processes to automate screening residential PV interconnection applications. Distribution System Protection Analysis and Relay Coordination (D-SPARC) Temporally, NLR analysis covers dynamic electromagnetic-transient studies, time-series power-flow, and annual simulation runs for long-range planning and forecasting.

distribution system planning

As part of this work, NLR is building out the Capacity Expansion Decision Support for Distribution Networks (CADET) model to deliver forward-looking, multi-objective investment strategies for utilities and policy makers. As power grids evolve and more objectives are incorporated into system planning, NLR is increasingly focused on integrated distribution planning. The Oregon Public Utility Commission (OPUC) will review PGE's DSP through a public process. U provides guidance to Alpena Power Company, Northern Power Company, and Upper Peninsula Power Company for the next iterations of their distribution system plans and closes the docket of U-21047, pending further Commission guidance.

NARUC has partnered with Lawrence Berkeley National Laboratory (LBNL) to provide public utility commissions with virtual and in-person training on electric distribution systems, utility distribution system planning, approaches to state engagement in integrated distribution planning, and modeling innovations for nearly ten years. An Integrated Distribution System Planning (IDSP) process provides a decision framework for developing holistic infrastructure investment strategies for local electricity grids. U set additional guidance and requirements for the Commission Staff, focused on the value of resilience https://ecrfeg.org/what-almost-no-one-knows-about-6/ and the desire for utilities to integrate a long-term vision in future DSPs. NLR's distribution system modeling and analysis allows the North American Energy Resilience Model to examine the impacts of widespread DER adoption on system resilience. U set DSP comment and reply dates for Alpena, NSP-W, and UPPCO; approved the DSP filing guidelines and a protective order; set hosting capacity map update requirements for DTE Electric and Consumers Energy; and set future DSP filing dates for utilities. The Commission has provided guidance to improve DSPs filings from utilities.

Additionally, NLR has been expanding analysis into distribution system reliability and resilience given increasing frequency of extreme weather events. NLR conducts both quasi-static time-series and electromagnetic transient analysis to understand the impacts of grid-edge fault-current on protection sensing and clearing. As part of this work, the laboratory has long-standing collaboration with partners in Hawaii examining advanced inverter functions and potential curtailment and field analysis of advanced inverter voltage control for both volt–ampere reactive and volt-watt control. NLR's DISCO tool is used for both solar hosting capacity and EV hosting capacity analysis and was used in the LA100 Study for service area upgrade analysis.

In South Africa, NLR worked with multiple government and industry stakeholders to examine the potential of demand response at the grid-edge. Another major focus on NLR's interconnection research is expanding capabilities to conduct distribution system hosting capacity analysis. NLR has also explored machine-learning processes to automate screening residential PV interconnection applications. Distribution System Protection Analysis and Relay Coordination (D-SPARC) Temporally, NLR analysis covers dynamic electromagnetic-transient studies, time-series power-flow, and annual simulation runs for long-range planning and forecasting.